NSR Permits for Review

NSR Permits for Review 



 






County

Permit Number & Writer  

Company

Application Received

Last Day to  Comment

 Documents

Marshall  R14-0030
Pursley
Moundsville Power, LLC, Moundsville October 7, 2013   December Application
 
R14-0030
Final Determination
Wood  R14-0032
Kessler
Appalachian Shale Cracker Enterprise LLC (ASCENT), Washington  May 15, 2014   Cover
Application
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
Appendix F 
 
Barbour
 Barbour G30-D194
Keatley
Mountaineer Keystone LLC;
Mackey Wolfe Station
January 22, 2015    Application 
Evaluation
Final Permit
 Berkeley
 Berkeley  13-2828E
Williams
Allmine Paving, LLC;
Inwood 
 August 4, 2014   Evaluation
Final Permit 
 Berkeley PD15-011
Williams
Allmine Paving, LLC;
Inwood
February 3, 2015    Application
Evaluation
Determination
 Berkeley PD15-050
Williams
Allmine Paving, LLC;
Inwood
June 22, 2015   Evaluation
Determination
 Berkeley R14-0026K
Pursley 
Essroc Cement Corporation;
Martinsburg
October 14, 2014   Evaluation
Final Permit
 Berkeley R14-0015L
Andrews
Knauf Insulation, LLC;
Inwood
March 11, 2015   Application 
Evaluation
Final Permit
 Berkeley  R14-0012F
Kessler
 Quad Graphics, Inc.;
Hedgesville
September 18, 2014    Evaluation
Final Permit
 Berkeley  13-3204
Andrews
VA Medical Center;
Martinsburg 
August 14, 2014   July 23, 2015 Evaluation
Final Permit
 Berkeley 13-1227C
Andrews
West Virginia Air National Guard;
167th TAG
  June 3, 2015 Evaluation
Final Permit
Boone
Boone  PD15-041
Griffith
Dominion Transmission, Inc.;
Madison City Plant
May 8, 2015   Application 
Evaluation
Determination
Boone 13-0772N
Roberts
Eastern Associated Coal, LLC;
Rocklick Complex
July 17, 2013    Evaluation
Final Permit 
 Boone G10-D031F
Roberts
Eastern Associated Coal, LLC;
Wells Plant
March 4, 2015   Application
Boone  G10-D078F
Roberts
Jack's Branch Coal Company;
Peytona/Indian Creek
February 13, 2015   Application 
Evaluation
Final Permit
Boone  13-1994D
Roberts
Pine Ridge Coal Company; 
Prenter No. 5 Plant 
July 18, 2014  May 15, 2015  Evaluation
Final Permit
Boone  G10-D047F
Roberts 
Raven Crest Contracting;
Ashford 
November 21, 2013    Evaluation
Final Permit 
 Boone G10-D057B
Roberts
Rivers Edge Mining LLC;
Wharton
February 13, 2015   Application 
Evaluation
Final Permit
 Braxton
Braxton  13-3252
Andrews
EQUITRANS, L.P.;
Burnsville #71
May 26, 2015   Application
 Braxton G60-C060A
Keatley
EQUITRANS, L.P.;
Burnsville #71
June 2, 2015   Evaluation
Final Permit
 Braxton G60-C060A
Keatley
EQUITRANS, L.P;
Burnsville #71
June 2, 2015   Application
Brooke
Brooke  13-3048A
Andrews
Appalachia Midstream Services, LLC;
Buffaol Station
December 4, 2014   Evaluation
Final Permit 
Brooke  13-2410D
Griffith
Ardagh Metal Packaging USA Inc.;
Weirton
June 8, 2015   Application
 Evaluation
Final Permit
 Brooke PD15-054
Rothwell
Ardagh Metal Packaging USA Inc.;
Weirton
July 16, 2015   Evaluation
Determination
Brooke 13-2978C 
Legg
Chesapeake Appalachia, LLC;
Linda Greathouse Pad
Septenber 5, 2014   Evaluation
Final Permit
Brooke 13-2977B
Keatley
Chesapeake Appalachia, LLC;
Robert Bone Pad
October 1, 2014    Evaluation
Final Permit
Brooke 13-3053A
Keatley 
 Chesapeake Appalachia, LLC;
State of WV DNR A Pad
October 1, 2014    Evaluation
Final Permit
Brooke  13-2987C
Keatley
Chesapeake Appalachia, LLC;
State of WV DNR B Pad
October 8, 2014    Evaluation
Final Permit 
Brooke G70-A100
Williams
Chesapeake Appalachia, LLC;
Violet Coss BRK Pad
 October 15, 2014   Evaluation
Final Permit
 Brooke 13-3205
Andrews 
ECC Windsor Inc.,
Windsor Mine
September 5, 2014   Evaluation
Final Permit
Brooke  13-0462B
Andrews
Petroleum Fuel & Terminal Company;
Weirton
October 23, 2015   Evaluation
Final Permit
 Brooke 13-2958C
Griffith
SWN Production Company, LLC;
John Harwatt Pad
May 8, 2015   Application
 Evaluation
Final Permit
Brooke  13-2980E
Rothwell
SWN Production Company, LLC;
John Hupp Pad
March 30, 2015   Application 
Evaluation
Final Permit
Cabell 
Cabell  G65-C370A
Legg
 American Tower Corporation;
Chelyan #99361
October 23, 2014   Evaluation
Final Permit
 Cabell 13-1646A
Pursley 
Huntington Alloys;
Huntington
October 27, 2014   Evaluation
Final Permit
 Cabell PD15-005
Rothwell
Huntington Alloys; Huntington  January 20, 2015   Application
 Evaluation
Determination
 Cabell 13-2532F
Griffith
Huntington Alloys;
Huntington
June 8, 2015   Application 
Evaluation
Final Permit
 Cabell G65-C539
Andrews
Mountwest Community and Technical College;
Huntington
October 23, 2014   Issued 
November 7, 2014 
 Cabell 13-2918A
Andrews
Richwood Investment Castings, Inc.;
Huntington
January 29, 2015    Application 
Evaluation
Final Permit
Calhoun
 Calhoun 13-2614B
Kessler
Dominion Transmission, Inc.;
Yellow Creek Station
April 3, 2015   Final Permit
Evaluation
Draft Permit
Fact Sheet 
Interim Permit Review
Application
Doddridge
 Doddridge 13-3201
Jennings
Antero Midstream, LLC;
Nichols Station
July 31, 2014   Evaluation
Final Permit
Doddridge  13-3216
Williams
Antero Midstream, LLC;
Tamela Station
October 17, 2014 February 5, 2015   Application 
Evaluation
Final Permit
 Doddridge G70-A109
Kees
Antero Resources Corporation;
Alexander Wellpad 
November 17, 2014   Evaluation
Final Permit
 Doddridge G70-A131
Jennings
Antero Resources Corporation;
Balli Wellpad
December 22, 2014    Evaluation
Final Permit
 Doddridge  G70-A131A
Griffith
Antero Resources Corporation;
Balli Wellpad
April 30, 2015   Application 
Evaluation
Final Permit
 Doddridge G70-A015B
Kees
Antero Resources Corporation;
Bee Lewis Wellpad
March 2, 2015   Application
Doddridge  G70-A122
Legg
Antero Resources Corporation;
Brooks Wellpad
December 5, 2014   Evaluation
Final Permit 
 Doddridge G70-A122A
Griffith
 Antero Resources Corporation;
Brooks Wellpad
 April 30, 2015   Application 
Evaluation
Final Permit
Doddridge  13-3167A
Williams
Antero Resources Corporation;
Canton North Station
January 7, 2015    Application 
Draft Permit
Fact Sheet
 Doddridge G70-A042A
Kees
Antero Resources Corporation;
Chestnut Wellpad
October 22, 2014   Evaluation
Final Permit
 Doddridge G70-A036B
Keatley
Antero Resources Corporation;
Cline Wellpad
February 5, 2015   Application 
Evaluation
Final Permit
 Doddridge G70-A018B
Keatley
Antero Resources Corporation;
Coastal Hilltop Pad
February 10, 2015   Application 
Evaluation
Final Permit
 Doddridge G70-A024A
Kees
 Antero Resources Corporation;
Delbert Leatherman Wellpad
November 13, 2014   Evaluation
Final Permit
 Doddrige G70-A024B
Keatley
Antero Resources Corporation;
Delbert Leatherman Wellpad
February 10, 2015   Application 
Evaluation
Final Permit
 Doddridge  G70-A005A
Kees
Antero Resources Corporation;
Hamilton Wellpad
November 13, 2014   Evaluation
Final Permit 
 Doddridge G70-A103
Kees
Antero Resources Corporation;
Hardwood Wellpad
October 31, 2014   Evaluation
Final Permit
 Doddridge G70-A139
Kees
Antero Resources Corporation;
Helen Hines Wellpad
January 20, 2015    Application 
Evaluation
Final Permit
Doddridge  G70-A139A
Griffith
Antero Resources Corporation;
Helen Hines Wellpad
April 30, 2015   Application
 Evaluation
Final Permit
 Doddridge 13-3255
Kees
Antero Resources Corporation;
Hinter Heirs FWI
June 11, 2015   Application
Draft Permit
Fact Sheet
Doddridge  G70-A025B
Kees
Antero Resources Corporation;
Hughes Wellpad
June 29, 2015   Application
 Doddridge G70-A116
Kees
Antero Resources Corporation;
Ike Wellpad
November 24, 2014   Evaluation
Final Permit 
Doddridge  G70-A130
Jennings
Antero Resources Corporation;
James Webb Wellpad
December 22, 2014    Application 
Evaluation
Final Permit​
 Doddridge G70-A130A
Griffith
Antero Resources Corporation;
James Webb Wellpad
April 30, 2015   Application 
Evaluation
Final Permit
Doddridge  G70-A108
Keatley
Antero Resources Corporation;
Lemley Wellpad
November 13, 2014     Evaluation 
Final Permit
 Doddridge G70-A108A
Keatley
Antero Resources Corporation;
Lemley Wellpad
March 11, 2015   Application 
Evaluation
Final Permit
Doddridge  G70-A141
Kees
Antero Resources Corporation;
Lick Run Wellpad
January 21, 2015   Application 
Evaluation
Final Permit
 Doddridge G70-A141A
Griffith
 Antero Resources Corporation;
Lick Run Wellpad
April 30, 2015   Application 
Evaluation
Final Permit
Doddridge  G70-A011A
Pursley
Antero Resources Corporation;
Maxwell Horizontal
February 9, 2015   Application 
Evaluation
Final Permit
 Doddridge G70-A098
Kees
Antero Resources Corporation;
Melody Wellpad
September 22, 2014   Evaluation
Final Permit
Doddridge  G70-A123A
Griffith
Antero Resources Corporation;
Middle Wellpad
April 30, 2015   Application
Doddridge  13-3106A
Kessler
Antero Resources Corporation;
New Milton Station
January 7, 2015 April 16, 2015   Application 
Evaluation
Final Permit
 Doddridge G70-A123
Legg
Antero Resources Corporation;
Middle Wellpad
December 5, 2014   Evaluation
Final Permit 
 Doddridge G70-A123A
Griffith
Antero Resources Corporation;
Middle Wellpad
April 30, 2015   Evaluation
Final Permit
 Doddridge 13-3242
Kees
Antero Resources Corporation;
Pearl Jean Wellpad
March 16, 2015  June 11, 2015 Application 
Evaluation
Final Permit
Doddridge  G70-A039A
Kees
Antero Resources Corporation;
Pennington North Pad
September 29, 2014   Evaluation
Final Permit
 Doddridge G70-A039B
Kees
Antero Resources Corporation;
Pennington North Pad
June 29, 2015   Application
 Doddridge G70-A069A
Kees
Antero Resources Corporation; Pennington South Pad  September 29, 2014   Evaluation
Final Permit
Doddridge  G70-A069B
Kees
Antero Resources Corporation;
Pennington South Pad
June 29, 2015   Application 
 Doddridge G70-A045B
Kees
Antero Resources Corporation;
Powell Pad
February 20, 2015   Application 
Evaluation
Final Permit
 Doddridge G70-A028A
Keatley
Antero Resources Corporation;
Primm Wellpad
November 24, 2014    Evaluation
Final Permit
Doddridge  G70-A028B
Kees
Antero Resources Corporation;
Primm Pad
May 13, 2015   Application 
Evaluation
Final Permit
Doddridge  G70-A105
Kees
Antero Resources Corporation;
Red Lick Wellpad
October 31, 2014   Evaluation
Final Permit
Doddridge  G70-A023A
Keatley 
Antero Resources Corporation;
Richard Garry
February 6, 2015   Application 
Evaluation
Final Permit
 Doddridge  G70-A004A
Keatley
Antero Resources Corporation;
RJ Smith Wellpad
November 24, 2014   Evaluation
Final Permit 
 Doddridge G70-A043A
Kees
Antero Resources Corporation;
Robert Williams Pad
July 30, 2015   Applicaiton
 Doddridge 13-3260
Williams
Antero Resources Corporation;
Sandstrom Facility
July 22, 2015   Application
Doddridge  G70-A168
Keatley
Antero Resources Corporation;
Stanley Well pad
June 29, 2015   Application
 Doddridge G70-A125
Jennings
Antero Resources Corporation;
Strickling Wellpad
December 12, 2014    Application 
Evaluation
Final Permit
Doddridge  G70-A125A
Griffith
Antero Resources Corporation;
Strickling Wellpad 
April 30, 2015   Application 
Evaluation
Final Permit
 Doddridge G70-A110
Kees
Antero Resources Corporation;
Victor Wellpad
November 17, 2014   Evaluation
Final Permit
 Doddridge G70-A127
Keatley
Antero Resources Corporation;
Wagner Pad
December 11, 2014   Application 
Evaluation
Final Permit
Doddridge  G70-A127A
Griffith
Antero Resources Corporation;
Wagner Pad 
April 30, 2015    Application
 Evaluation
Final Permit
 Doddridge G70-A153
Keatley
Antero Resources Corporation;
Willard Wellpad
March 17, 2015   Application 
Evaluation
Final Permit
Doddridge  G70-A153A
Griffith
Antero Resources Corporation;
Willard Wellpad
June 11-2015   Application 
Evaluation
Final Permit
Doddridge  G70-A104
Kees
Antero Resources Corporation;
Wolf Pen Wellpad
October 31, 2014   Evaluation
Final Permit
 Doddridge G70-A120
Kees
Antero Resources Corporation;
Yvonne Wellpad
December 1, 2014    
Doddridge  13-3237
Kessler
CNX Gas Company LLC;
Oxford 11 Wellpad
February 12, 2015  May 21, 2015 Application 
Evaluation
Final Permit
 Doddridge 13-3237A
Griffith
CNX Gas Company LLC;
Oxford 11 Wellpad
June 12, 2015   Application 
Evaluation
Final Permit
 Doddridge 13-3248
Kessler
CNX Gas Company LLC;
Oxford 13 Wellpad
 May 5, 2015  August 27, 2015 Application 
Draft Permit
Fact Sheet
Interim Permit Review
 Doddridge 13-3208
Williams
CONE Gathering, LLC;
Oxford Station
September 5, 2014    January 29, 2015  Application
Evaluation
Final Permit
Doddridge  13-3208A
Williams
CONE Gathering, LLC;
Oxford Station
March 16, 2015  July 23, 205 Application 
Evaluation
Final Permit
 Doddridge G35-A053A
Pursley
Dominion Transmission, Inc.;
Big Isaac Station
January 5, 2014    Application 
Evaluation
Final Permit
Doddridge  13-1077A
Andrews
Dominion Transmission, Inc.;
L.L. Tonkin Station
October 22, 2014 March 19, 2015  Evaluation
Final Permit 
Doddridge  G35-A031B
Keatley
Dominion Transmission, Inc.;
Maxwell Station
April 22, 2015   Application 
Evaluation
Final Permit
Doddridge  13-2695B Dominion Transmission, Inc.;
Smithburg Station
June 3, 2015    Application
Doddridge  13-3095A
Pursley
EQT Gathering;
Pandora Station
March 30, 2015  August 27, 2015 Application  
Interim Permit Review
Draft Permit
Fact Sheet
 Doddridge G70-A027B
Kees
EQT Production Company;
SMI-27
January 12, 2015   Application 
Evaluation
Final Permit
Doddridge  G70-A142
Kees
EQT Production Company;
SMI-28
January 23, 2015    Application 
Evaluation
Final Permit
Doddridge  G70-A160
Keatley
EQT Production Company;
OXF-44 Pad
May 15, 2015    Application 
Evaluation
Final Permit
Doddridge  G70-A133
Kees
EQT Production Company;
OXF-45 Pad
December 29, 2014    Application
Evaluation
Final Permit
 Doddridge G70-A114
Keatley
EQT Production Company;
OXF-127 Pad
November 21, 2014   Evaluation Final Permit 
 Doddridge G70-A132
Kees
EQT Production Company;
OXF-131 Pad
December 29, 2014   Application 
Evaluation
Final Permit
Doddridge  G70-A074
Kees
EQT Production Company;
OXF-134 Pad
August 1, 2014   Evaluation
Final Permit
 Doddridge G70-A031A
Keatley
EQT Production Company;
OXF-150 Pad
June 2, 2015    Application
 Doddridge G70-A169
Keatley
EQT Production Company;
OXF153
July 17, 2015   Application
 Doddridge G70-A112
Keatley
EQT Production Company;
OXF-157 Pad
November 21, 2014   Evaluation
Final Permit 
 Doddridge G70-A112A
Legg
EQT Production Company;
OXF-157 Pad 
June 15, 2015   Application 
Evaluation
Final Permit
 Doddridge G70-A158
Keatley
EQT Production Company;
OXF-159
April 23, 2015   Application 
Evaluation
Final Permit
 Doddridge G70-A170
Keatley
EQT Production Company;
WEU2
July 17, 2015   Application
 Doddridge G70-A113
Keatley
EQT Production Company;
WEU-6 Pad
November 21, 2014   Evaluation
Final Permit 
Doddridge  G70-A137
Kees
EQT Production Company;
WEU-8
January 5, 2015   Application 
Evaluation
Final Permit
 Doddridge G70-A151
Keatley
EQT Production Company;
WEU-49
March 9, 2015   Application 
Evaluation
Final Permit
 Doddridge G70-A099
Williams
EQT Production Co.;
WEU-51
September 24, 2014   Evaluation
Final Permit
 Doddridge G70-A079
Kees
Jay-Bee Oil & Gas;
Coffman
August 11, 2014   Evaluation
Final Permit
 Doddridge G70-A079A
Kees
Jay-Bee Oil & Gas;
Coffman
March 24, 2015   Application
Evaluation
Final Permit
 Doddridge G70-A078
Kees
Jay-Bee Oil & Gas;
Hurley
August 11, 2014   Evaluation
Final Permit
Doddridge  G70-A077
Keatley
Jay-Bee Oil & Gas;
McIntyre
August 11, 2014   Evaluation
Final Permit
Doddridge  G70-A096
Kees
Jay-Bee Oil & Gas;
Sneezy Pad 
September 5, 2014   Evaluation
Final Permit
Doddridge  G70-A096A
Kees
Jay-Bee Oil & Gas;
Sneezy Pad
May 28, 2015   Application 
Evaluation
Final Permit
Doddridge  13-2914C
Andrews
Mark West Liberty Midstream & Resources;
Sherwood
December 11, 2014   Application 
Doddridge  13-2929B
Jennings
Mountaineer Midstream Company, LLC;
Midpoint Station
May 20, 2014    Evaluation
Final Permit
Doddridge  13-2929C
Jennings
Mountaineer Midstream Company, LLC;
Midpoint Station
February20, 2015   Application 
Evaluation
Final Permit
 Doddridge G70-A001A
Williams
Noble Energy, Inc.;
OXFD1
August 18, 2014   Evaluation
Final Permit
 Doddridge G70-A001B
Legg
Noble Energy, Inc.;
Oxford 1
July 23, 2015   Application 
Interim Permit Review
Evaluation
Final Permit
Doddridge  13-3239
Kessler
Rover Pipeline LLC;
Sherwood Station
March 2, 2015 July 16, 2015 Application 
Draft Permit
Fact Sheet
Fayette
 Fayette 13-3220
Jennings
EQT Gathering LLC;
Armstrong Creek Station
August 25, 2014 May 26, 2015  Evaluation
Final Permit
 Fayette G30-D195
Griffith
EQT Gathering, LLC;
Pocahontas Station
April 20, 2015   Application
Evaluation
Final Permit​
Fayette  PD15-030
Rothwell
Hardy Cellular Telephone Company;
Gatewood- 757335
March 26, 2015   Application 
Evaluation
Determination
 Fayette 13-3120A
Roberts
Kingston Mining, Inc.;
Kingston Prep Plant
 October 20, 2014   Withdrawal 
Fayette  G10-D086G
Roberts
Maple Coal Company;
Powellton
November 10, 2014    Evaluation
Final Permit
Gilmer 
 Gilmer PD15-019
Rothwell
 Dominion Transmission, inc.;
HG Well # 13181
February 23, 2015   Application 
Evaluation
Determination
Gilmer  PD15-020
Rothwell
Dominion Transmission, Inc.;
HG Well # 13183
February 23, 2015   Application 
Evaluation
Determination
 Gilmer PD15-021
Rothwell
Dominion Transmission, Inc.;
HG Well #13185
February 23, 2015   Application 
Evaluation
Determination
Grant
Grant  13-2034E
Pursley
Virginia Electric & Power Company
Mt. Storm
October 14, 2014 June 11, 2015  Evaluation
Final Permit
Greenbrier
Greenbrier  G40-C019D
Martin
Boxley Aggregates of West Virginia, L.L.C.;
Alta
January 15, 2015    Application
Evaluation
Final Permit
Greenbrier  G65-C549
Rothwell
Cellco Partnership dba Verizon Wireless;
Ronceverte
February 4, 2015    Application 
Evaluation
Final Permit
 Greenbrier G10-D159
Roberts
Greenbrier Smokeless Coal Mining, LLC;
Pollock Mine
May 15, 2015   Application 
Evaluation
Final Permit
Greenbrier  G10-D085E
Roberts
Greenbrier Smokeless Coal Mining, LLC;
Rupert
 May 13, 2015   Application
Greenbrier  G60-C075
Martin
Greenbrier Valley Medical Center;
Ronceverte
April 2, 2015   Application 
Evaluation
Final Permit
 Greenbrier G10-D035E
Roberts
Midland Trail Resources, LLC;
Rupert
August 19, 2015   Final Permit
Evaluation
Interim Permit Review
Application
 Greenbrier G20-B021A
Martin
Southern WV Asphalt, Inc.;
Plant #52 Alta
November 17, 2014   Evaluation
Final Permit 
Hancock
Hancock  13-0032B
Andrews
ArcelorMittal
Weirton, Inc.
June 25, 2014   Evaluation
Final Permit
 Hancock 13-2334W
Jennings
Ergon Corporation-WV, Inc.;
Newell
June 30, 2014   Evaluation
Final Permit
Hancock  13-2334X
Jennings
Ergon Corporation-West Virginia, Inc.;
Newell (Congo Plant)
December 29, 2014  June 5, 2015 Application 
Evaluation
Final Permit
Hancock  13-2164D
Pursley
The Homer Laughlin China Company;
Newell
August 11, 2014   Evaluation
Final Permit
 Hancock 13-3222
Martin
Mountaineer Park Inc.;
Chester
October, 30, 2014  January 20, 2015   Evaluation
Final Permit 
Hardy 
 Hardy 13-2571M
Kessler
American Woodmark Corporation;
South Branch
February 6, 2015   Application 
Evaluation
Final Permit
Harrison
Harrison  G70-A034A
Kees
Antero Resources Corporation;
Corder East Wellpad
October 22, 2014   Evaluation
Final Permit
 Harrison G70-A034B
Keatley
Antero Resources Corporation;
Corder East Wellpad
February 10, 2015   Application 
Evaluation
Final Permit
 Harrison 13-1364G
Martin
Aurora Flight Sciences of West Virginia, Inc.;
Bridgeport
May 21, 2015   Application 
Evaluation
Final Permit
 Harrison 13-2236B
Pursley
Bombardier Services Corporation;
Bridgeport
January 29, 2015  June 11, 2015 Application 
Evaluation
Final Permit
 Harrison 13-2306E
Roberts
 Consol/Robinson Run Plant;
Lumberport
May 18, 2015   Application
 Harrison G65-C552
Legg
Dominion Transmission, Inc.;
Bridgeport Office
March 20, 2015 Application 
Evaluation
Final Permit
 Harrison 13-1801G
Andrews
Dominion Transmission, Inc.;
Bridgeport Station
July 22, 2014  June 11, 2015 Evaluation
Final Permit
 Harrison G35-A057A
Legg
Dominion Transmission, Inc.;
Chapman Compressor Station
March 9, 2015   Application 
Evaluation
Final Permit
Harrison  G65-C548
Rothwell
Dominion Transmission Corporation; Clarksburg February 3, 2015    Application 
Evaluation
Final Permit
 Harrison 13-2915A
Pursley
Dominion Transmission, Inc.;
Sardis Station
August 13, 2014 May 7, 2015  Evaluation
Final Permit
Harrison  13-2856B
Jennings
Dominion Transmission, Inc.;
Wisonburg Station
September 8, 2014 May 6, 2015  Evaluation
Final Permit
 Harrison 13-3228
Martin
Highland/Clarksburg Hospital, Inc. December 18, 2014  April 1, 2015  Application 
Evaluation
Final Permit
Harrison  13-3218
Jennings
M3 Appalachia Gathering, LLC;
Lumberport Booster Station
 August 18, 2014  January 26, 2015 Evaluation
Final Permit 
 Harrison 13-2968A
Jennings
Mountaineer Midstream Company, LLC;
Zinnia Station
May 20, 2014    
 Harrison 13-2968B
Jennings
Mountaineer Midstream Company, LLC;
Zinnia Station
February 20, 2015   Application 
Evaluation
Final Permit
 Harrison 13-3236
Pursley
O-Tex Pumping, L.L.C.;
Clarksburg
February 10, 2015  August 13, 2015  Final Permit
Evaluation
Draft Permit
Fact Sheet
Interim Permit Review
 Application 
 Harrison G35-A107A
Kees
PDC Mountaineer, LLC;
PDC West Compressor
March 11, 2015   Application
Evaluation
Final Permit
 Harrison 13-2880A
Legg
Skana Aluminum Company;
Wilsonburg
 April 3, 2015   Application 
Evaluation
Final Permit
Harrison  13-2581A Stockmeier Uretanes inc.;
Clarksburg
September 25, 2014  
Harrison  G70-A159
Kees
XTO Energy Inc;
Boggess Wellpad
April 23, 2015   Application 
Evaluation
Final Permit
 Jackson
 Jackson 13-2864B
Pursley
Armstrong World Industries, Inc.;
Millwood
February 13, 2015   Final Permit
Evaluation
Draft Permit
Fact Sheet
Interim Permit Review
 Application 
 Jackson PD15-014
Rothwell
Cellco Partnership dba Verizon Wireless;
Goldtown Tower
February 18, 2015   Application 
Evaluation
Determination
 Jackson PD15-009
Rothwell
Cellco Partnership dba Verizon Wireless;
Hemlock Tower
January 20, 2015   Application
Evaluation
Determination
 Jackson PD15-008
Rothwell
Cellco Partnership dba Verizon Wireless;
Medina Tower
January 20, 2015    Application
Evaluation
Determination
 Jackson PD15-007
Rothwell
Cellco Partnership dba Verizon Wireless;
Parchment Valley Tow
January 20, 2015   Application
Evaluation
Determination
Jackson  PD15-006
Rothwell
Cellco Parntership dba Verizon Wireless;
Sydneyville Tower
January 20, 2015   Application
Evaluation
Determination
 Jackson 13-2376D
Pursley
Constellium Rolled Products;
Ravenswood, LLC
February 20, 2015  July 30, 2015 Final Permit
Evaluation
Draft Permit 
Fact Sheet
Interim Permit Review
Application
 Jackson Pd15-063
Griffith
SDR Plastics, Inc.;
Ravenswood
August 10, 2015   Determination
Evaluation
Interim Permit Review
Application
 Jackson 13-2085F
Pursley
STAR PLASTICS;
Millwood
January 29, 2015  June 4, 2015  Application 
Evaluation
Final Permit
Jefferson
 Jefferson 13-3202
Andrews
Charles Town Utility Board;
Water Treatment Plant
August 7, 2014   Evaluation
Final Permit
Jefferson  G60-C071
Rothwell
U.S. Fish & Wildlife Service;
Shepherdstown
February 3, 2015   Application 
Evaluation
Final Permit
Kanawha
 Kanawha  13-2659A
Andrews
The Adjutant General's Department;
Charleston
June 2, 2015   Application 
Evaluation
Final Permit
 Kanawha G20-B030C
Martin
American Asphalt of WV, LLC;
St. Albans
October 9, 2014   Evaluation
Final Permit
 Kanawha PD15-035
Rothwell
Bayer CropScience;
Institute
April 20, 2015   Application 
Evaluation
Determination
 Kanawha G60-C054A
Kees
Bayer CropScience;
Institute
May 12, 2015   Application 
Evaluation
Final Permit
Kanawha  13-2561K
Legg
Bayer MaterialScience, LLC;
South Charleston
June 10, 2015   Final Permit
Evaluation
Interim Permit Review
 Kanawha G60-C074
Rothwell
Charleston Area Medical Center;
Memorial Division
March 20, 2015   Final Permit
 Evaluation
Interim Permit Review
 Application
 Kanawha 13-3230
Andrews
The Chemours Company FC, LLC;
Belle
 January 8, 2015   Application
 Kanawha PD15-043
Rothwell
The Chemour Company FC, LLC;
Belle
May 18, 2015   Application 
Determination
 Kanawha 13-2247B
Jennings
Columbia Gas Transmission, LLC;
Clendenin Station
April 29, 2014  Evaluation
Final Permit
Kanawha  13-2087E
Legg
Columbia Gas Transmission, LLC;
Coco
February 6, 2015  June 15, 2015 Application 
Evaluation
Final Permit
 Kanawha 13-2371C
Andrews
Cooke & Pauley Funeral Home Inc. dba Cooke Funeral Home July 13, 2015   Application
Kanawha  G10-D100E
Roberts
Coyote Coal Co.;
Blue Creek Plant
October 22, 2014   Evaluation
Final Permit
Kanawha  13-2765B
Kessler
Cranberry Pipeline Corporation;
Bonham Station
April 27, 2015  July 29, 2015  Final Permit
Evaluation
 Draft Permit
Fact Sheet 
Interim Permit Review
Application
 Kanawha PD15-003
Andrews
E. I. du Pont de Nemours and Company;
Belle
January 14, 2015   Application 
Evaluation
Determination
 Kanawha 13-1847F
Andrews
Elementis Specialtis, Inc.;
Charleston
October 14, 2014    
 Kanawha G10-D017D
Roberts
Emerald Processing;
Chesapeake
July 25, 2014   Evaluation
Final Permit
Kanawha  PD15-023
Kessler
Enviromine, Inc.;
Nitro
March 2, 2015   Evaluation
Determination
 Kanawha 13-3149
Andrews
Gestamp West Virginia, LLC;
South Charleston
October 25, 2013  February 27, 2015 Evaluation
Final Permit
 Kanawha G60-C072
Martin
Highland Hospital Association;
Charleston
March 9, 2015   Application 
Evaluation
Final Permit
Kanawha  13-1975G
Roberts
Jacks Branch Coal Company;
Cannelton
January 15, 2015   Application 
 Kanawha 13-1975H
Roberts
Jacks Branch Coal Company;
Cannelton
March 4, 2015   Application
Kanawha  G10-D157
Roberts
Jacks Branch Coal Company;
Marmet
October 22, 2014   Evaluation
Final Permit 
 Kanawha 13-1999F
Legg
Marathon Petroleum Company LP;
Charleston
February 20, 2015   Application 
Evaluation
Final Permit
 Kanawha G65-C545
Legg
Mountaineer Gas Company;
Charleston
December 15, 2014   Evaluation
Final Permit
Kanawha  13-2623C
Pursley
NGK Spark Plugs, Inc;
Sissonville
September 10, 2014  March 2, 2015  Evaluation
Final Permit
 Kanawha PD15-024
Andrews
PRAXAIR, INC.;
Belle
March 6, 2015   Application 
Evaluation
Final Permit
 Kanawha G33-A003A
Legg
Reed Brothers Limited Parkernship;
Ward
December 18, 2014   Application 
 Kanawha 13-3232
Kees
Tennessee Gas Pipeline Company, L.L.C.;
Station 118A
February 3, 2015  May 7, 2015 Application
Evaluation
Final Permit
Kanawha  13-3233
Kees
Tennessee Gas Pipeline Company, L.L.C.;
Station 119A
February 3, 2015   Application 
Evaluation
Final Permit
Kanawha  13-3025A
Pursley
Union Carbide Corporation;
South Charleston
January 29, 2015   Application
 Evaluation
Final Permit
Kanawha  13-1517C
Jennings
Union Carbide Corporation;
South Charleston
March 10, 2015   Application 
Evaluation
Final Permit
 Kanawha 13-3243
Pursley
Union Carbide Corporation;
South Charleston
May 13, 2015   Application 
Evaluation
Final Permit
Kanawha  13-1517D
Griffith
Union Carbide Corporation;
South Charleston
May 15, 2015   Application 
Evaluation
Final Permit
Kanawha  PD15-037
Rothwell
United Parcel Service, Inc.;
Charleston
 April 29, 2015   Application 
Evaluation
Determination
 Kanawha G20-B187B
Martin
WV Paving, Inc.;
Plant #30 Dunbar
November 17, 2014    
Lewis 
Lewis  G65-C544
Martin
Cellco Partnership dba Verizon Wireless;
Tulley Ridge
November 26, 2014    
Lewis  G70-A093
Keatley
CNX Gas Company;
Camden 17
September 8, 2014   Withdrawal 
 Lewis PD15-004
Keatley
CNX Gas Company;
Camden 17
January 16, 2015   Evaluation
Determination
 Lewis 13-3243
Keatley
CNX Gas Company;
Camden 17
March 19, 2015 July 10, 2015  Application 
Evaluation
Final Permit
Lewis  13-3227
Andrews
Cone Midstream Partners, LP;
Camden Station
November 20, 2014 June 22, 2015  Evaluation
Final Permit
 Lewis PD15-012
Rothwell
Dominion Transmission, Inc.;
GP Station
February 9, 2015   Application
Evaluation
Determination 
 Lewis PD15-016
Rothwell
Dominion Transmission, Inc.;
GPStation-Steve Hall
February 25, 2015   Application 
Evaluation
Determination
 Lewis PD15-017
Rothwell
Dominion Transmission, Inc.;
HG Well #13139
February 23, 2015   Application
Evaluation
Determination
 Lewis PD15-018
Rothwell
Dominion Transmission, Inc.;
HG Well #13141
February 23, 2015   Application 
Evaluation
Determination
 Lewis G70-A161
Keatley
EQT Production Company;
PET-35 Pad
May 12, 2015   Application 
Evaluation
Final Permit
 Lewis 13-2397C
Andrews
EQUITRANS, L.P.;
Weston
April 17, 2015   Application
Lincoln 
 Lincoln 13-2479C
Jennings
Columbia Gas Transmission, LLC;
Hubball Station
November 21, 2014    Evaluation
Final Permit
Logan 
 Logan PD15-053
Andrews
The Adjutant General's Dept.;
Logan
July 15, 2015   Application 
Evaluation
Determination
Logan  G65-C553
Andrews
The Adjutant General's Dept.;
Logan-Mingo Center
July 15, 2015   Application
 Logan G10-D099E
Roberts
Bandmill Coal Corporation;
Rum Creek Plant
April 30, 2015   Application 
Evaluation
Final Permit
Logan  13-2776B
Jennings
Chesapeake Appalachia, LLC;
Smokehouse Station
August 25, 2014   Evaluation
Final Permit 
Logan  PD15-039
Rothwell
Chesapeake Appalachia, LLC;
Smokehouse Station
May 1, 2015   Evaluation
Determination
 Logan G10-D103F
Roberts
Cliffs Logan County Coal, LLC;
Saunders Prep Plant
 November 21, 2014    
Logan  G10-D068H
Roberts​
Mingo Logan Coal Co.;
Cardinal Prep Plant
March 25, 2015   Application 
Evaluation
Final Permit
Logan  G10-D158
Roberts
Ramaco Resources, LLC;
Elk Creek Prep Plant
November 26, 2014    Evaluation
Final Permit
McDowell 
 McDowell G10-D153A
Roberts
Caretta Minerals, LLC;
Caretta Prep Plant
November 5, 2014   Evaluation
Final Permit 
McDowell  G10-D153B
Roberts
Caretta Minerals, LLC;
Caretta Prep Plant
March 25, 2015   Application
McDowell  G65-C551
Martin
City of Welch;
Water Treatment Plant
March 12, 2015   Application 
Evaluation
Final Permit
McDowell  G35-A020A
Keatley
GeoMet Operating Company, Inc.;
Jolo
June 13, 2014    
 McDowell G10-D062A
Roberts
Mid-Vol Coal Sales, Inc.;
Mine No. 8 Loadout
April 1, 2015   Application
 McDowell PD15-056
Griffith
Radius Energy Service, LLC;
Fanrock
July 23, 2015   Determination
Evaluation
Interim Permit Review
Marion 
 Marion G65-C540
Martin
Cellco Partnership dba Verizon Wireless;
Colfax
November 26, 2014    
Marion  G65-C541
Martin
Cellco Partnership dba Verizon Wireless;
Rachel
November 26, 2014    
 Marion G65-C542
Martin
Cellco Partnership dba Verizon Wireless;
Rivesville
November 26, 2014    
 Marion G65-C543
Martin
Cellco Partnership dba Verizon Wireless;
Rt. 73
November 26, 2014    
Marion  13-0760E
Roberts
Consolidation Coal Company;
Loveridge Plant
September 17, 2014  March 2, 2015  Evaluation
Final Permit
 Marion G65-C547
Thornton
Greater Marion Public Service District;
Carolina Pump Station 
January 7, 2015    Application 
Evaluation
Final Permit
 Marion G65-C546
Thornton
Greater Marion Public Service District;
Idamay Pump Station
January 7, 2015   Application 
Evaluation
Final Permit
Marion  G35-A064D
Legg
M3 Appalachia Gathering, LLC;
Daybrook Station
September 19, 2014   Evaluation
Final Permit
 Marion 13-3176
Jennings
Ridge Runner Industries, Inc.;
Fairmont
March 4, 2014  April 1, 2015 Evaluation
Final Permit
Marion  G40-C071
Martin
XTO Energy Inc.;
Coastal Crusher
March 18, 2015   Application 
Evaluation
Final Permit
 Marion G70-A154
Kees
XTO Energy Inc.;
Four States Wellpad
April 1, 2015   Application 
Evaluation
Final Permit
Marshall 
Marshall  13-2831E
Andrews
Appalachia Midstream Services, LLC;
Miller Station
April 1, 2015   Application
Marshall  PD15-058
Williams
Appalachia Midstream Services, LLC;
Pleasants
 July 27, 2015   Evaluation
Determination
 Marshall 13-2896C
Kessler
Blue Racer Midstream, LLC;
Natrium Extraction & Fractionation Plant
August 3, 2014   Evaluation
Final Permit
Marshall   13-2896D
Kessler
Blue Racer Midstream, LLC;
Natrium Extraction and Fractionation Plant
April 17, 2015   Application
 Marshall 13-2896E
Kessler
Blue Racer Midstream, LLC
Natrium Ex. & Fract.
July 7, 2015   Application
 Marshall G60-C070
Pursley
Certain Teed Gypsum WV, Inc.;
Moundsville
January 16, 2015   Application 
Evaluation
Final Permit
Marshall  13-2934D
Keatley
Chesapeake Appalachia, LLC;
Michael Southworth
December 18, 2014    Application
 Marshall G70-A094
Keatley
Chesapeake Appalachia, LLC;
Van Aston Pad
September 5, 2014 Evaluation
Final Permit
Marshall  G70-A167
Griffith
Chevron Appalachia, LLC;
Francis Pad
June 16, 2015   Final Permit
Evaluation
Interim Permit Review
 Application
 Marshall 13-3254
Andrews
Columbia Gas Transmission, LLC;
Lone Oak Station
June 5, 2015   Application
 Marshall 13-3081C
Williams
CONE Gathering LLC;
Majorsville
July 20, 2015   Application
 Marshall PD15-051
Rothwell
CONE Midstream Partners, LP;
Moundsville Site
June 30, 2015   Application 
Evaluation
Determination
 Marshall R14-0030A
Pursley
Moundsville Power, LLC;
Moundsville
April 23, 2015   Final Permit
Evaluation
Interim Permit Review
 Application
 Marshall G70-A162
Keatley
Northeast natural Energy LLC;
Yost Wellpad
May 12, 2015   Application 
Evaluation
Final Permit​
 Marshall G70-A094A
Keatley
 SWN Production Company, LLC;
Van Aston Pad
April 8, 2015    Application
 Evaluation
Final Permit
 Marshall PD15-034
Keatley
SWN Production Company, LLC;
Van Aston Pad
April 20, 2015   Application 
Evaluation
Final Permit
Marshall  13-3135A
Legg
Chevron Appalachia;
Carmichael Site
August 25, 2014 Evaluation
Final Permit
Marshall  13-3140B
Rothwell
Chevron Appalachia;
Caveney Site
August 15, 2014    
 Marshall 13-3137B
Rothwell
Chevron Appalachia; Curry Site August 15, 2014    
 Marshall 13-3141A
Rothwell
Chevron Appalachia;
Taylor Site
August 15, 2014    
Marshall  PD15-010
Rothwell
CONE Midstream Partners, LP;
Moundsville Site
January 21, 2015    Application
Evaluation
Determination
Marshall  13-2834C
Andrews
Dominion Transmission, Inc.;
Burch Ridge Station
June 2, 2014  December 10, 2014   Draft Permit
Fact Sheet 
 Marshall PD15-052
Pursley
Mississippi Sand, LLC;
Benwood
July 1, 2015   Application
Marshall  G70-A047
Keatley
Noble Energy, Inc.;
Sand Hill 13
May 8, 2014   Evaluation
Final Permit 
Marshall  G70-A119
Kees
Noble Energy, Inc.;
Sand Hill 23
December 1, 2014   Evaluation
Final Permit 
 Marshall G70-A121
Kees
Noble Energy, Inc.;
Sand Hill 25
December 3, 2014    
 Marshall 13-3238
Williams
Rover Pipeline LLC;
Majorsville Station
March 2, 2015  May 21, 2015 Application 
Evaluation
Final Permit
Marshall  PD15-025
Rothwell
Trans Energy, Inc.;
Goshorn Wellpad
March 9, 2015   Application 
Evaluation
Determination
 Marshall 13-3203
Pursley
Unimin Corporation;
Benwood terminal
August 13, 2014   Evaluation
Final Permit
Marshall  13-3206
Jennings
Williams Ohio Valley Midstream, LLC;
Burch Ridge Station
September 5, 2014  April 24, 2015  Evaluation
Final Permit
Marshall  13-3085A
Griffith
Williams Ohio Valley Midstream, LLC;
Caveney Station
June 9, 2015   Application 
Evaluation
Final Permit
Marshall  13-3168A
Rothwell
Williams Ohio Valley Midstream, LLC;
Conner Station
June 15, 2015   Application
Marshall  13-2826H
Williams
Williams Ohio Valley Midstream, LLC;
Ft. Beeler Plant
May 12, 2014   Evaluation
Final Permit
 Marshall 13-2826I
Kessler
Williams Ohio Valley Midstream, LLC;
Ft. Beeler
April 24, 2015   Application 
Evaluation
Final Permit
Marshall  13-3212
Williams
Williams Ohio Valley Midstream LLC;
Groves Dehy Station
September, 19, 2014   Evaluation
Final Permit
Marshall  13-3209
Williams
Williams Ohio Valley Midstream, LLC; Hazlet Station September 15, 2014  January 7, 2014 Draft Permit
Fact Sheet 
 Marshall 13-3209A
Keatley
Williams Ohio Valley Midstream, LLC;
Hazlet Station
May 29, 2015   Application 
Draft Permit
Fact Sheet
Marshall   13-3231
Jennings
Williams Ohio Valley Midstream LLC;
Keaton Dehy Station
January 9, 2015 June 22, 2015  Application 
Evaluation
Final Permit
 Marshall 13-3070A
Andrews
Williams Ohio Valley Midstream, LLC
Oak Grove Plant
January 13, 2015   Application 
 Marshall PD15-057
Kessler
Williams Ohion Valley Midstream, LLC;
Oak Grove Plant
July 23, 2015   Application 
Evaluation
Determination
 Marshall G60-C069
Legg
Williams Ohio Valley Midstream, LLC;
Ohio River
December 22, 2014    Application 
Evaluation
Final Permit
 Marshall 13-2892D
Kessler
Williams Ohio Valley Mdstream, LLC;
Ohio River
April 17, 2015   Application
 Marshall 13-3210
Williams
Williams Ohio Valley Midstream, LLC;
Snyder
September 11, 2014 January 7, 2014   Draft Permit
Fact Sheet 
Marshall  13-3210A
Keatley
Williams Ohio Valley Midstream, LLC;
Snyder
May 29, 2015 August 14, 2015  Application 
Draft Permit
Fact Sheet
 Marshall 13-3250
Williams
Williams Ohio Valley Midstream, LLC;
Starcovic
May 21, 2015 July 23, 2015  Application 
Evaluation
Final Permit
 Marshall 13-3246
Andrews
Williams Ohio Valley Midstream, LLC;
Stout Station
April 14, 2015    Application
Marshall  13-3109B
Keatley
Williams Ohio Valley Midstream;
Taylor Station
February 23, 2015  June 11, 2015 Application 
Evaluation
Final Permit
Marshall  13-3074A
Williams
Williams Ohio Valley Midstream, LLC;
Zien Station
 February 10, 2015  April 24, 2015 Application 
Draft Permit
Fact Sheet
Mason 
 Mason 13-0075H
Pursley
Appalachian Power Co. - Mountaineer Plant;
New Haven
March 20, 2015 August 13, 2015  Final Permit
Evaluation
Draft Permit
Fact Sheet
Interim Permit Review
 Application 
 Mason 13-2857D
Pursley
Felman Production;
Letart
July 18, 2014   Evaluation
Final Permit
 Mason 13-3217
Pursley
Fleman Production;
Letart
October 20, 2014  April 27, 2015 Evaluation
Final Permit
 Mason 13-3244T
Pursley
Felman Production;
Letart
 April 10, 2015   Application 
Evaluation
Final Permit 
Mason  13-3256T
Pursley
Felman Production;
Letart
June 22, 2015   Final Permit
Evaluation
Interim Permit Review
 Application
 Mason 13-2438Q
Chertkovsky
ICL-IP America Inc.;
Gallipolis Ferry
August 6, 2015   Final Permit
Evaluation
Interim Permit Review
Application
Mercer
 Mercer 13-3229
Andrews
Bluefield Hospital Company, LLC December 16, 2014  May 6, 2015 Application 
Evaluation
Final Permit
 Mercer G60-C068
Martin
Princeton Sanitary Baord October 10, 2014   Final Permit
Mineral 
 Mineral G60-C066
Andrews
Alliant Techsystems Operations, LLC;
Rocket Center
September 5, 2014   Evaluation
Final Permit
Mineral  13-3235T
Pursley
Alliant Techsystems Operations, LLC;
Rocekt Center
February 6, 2015    Application
Mingo 
Mingo  G30-D193
Keatley
Chesapeake Appalachia, LLC;
B-410/B-411 Station
October 16, 2014   Evaluation
Final Permit
 Mingo G30-D193A
Keatley
Chesapeake Appalachia LLC;
B-410/B-411
March 25, 2015   Evaluation
Final Permit
 Mingo 13-3253
Legg
TRAMCO Services, Inc.;
Williamson
May 26, 2015   Application
Mingo  G60-C076
Legg
Williamson Memorial Hospital;
Williamson
April 27, 2015   Application 
Evaluation
Final Permit​
Monongalia
 Monongalia PD15-036
Kessler
Addivant USA, LLC;
South Plant
April 22, 2015   Application 
Evaluation
Determination
Monongalia  PD15-047
Kessler
Addivant USA, LLC;
Morgantown
June 4, 2015   Application 
Evaluation
Determination
Monongalia  13-0718E
Roberts
Consolidation Coal Company;
Blacksville No. 2
September 17, 2014   January 9, 2014   Draft Permit
Fact Sheet
Monongalia  G10-D102F
Roberts
Cresco, LLC;
Maidsville Prep Plant
September 19, 2014   Final Permit
 Monongalia PD15-013
Rothwell
Crown Castel Solutions Corp.;
Morgantown
February 10, 2015   Application 
Evaluation
Determination 
 Monongalia 13-3219
Legg
Dynamic Industries, Inc.;
Morgantown 
October 23, 2014  April 24, 2015   Evaluation
Final Permit
 Monongalia 13-2640B
Legg
High Meadow Pet Crematory;
Fairmont
February 3, 2015 May 6, 2015   Application 
Evaluation
Final Permit
 Monongalia 13-2720C
Keatley
Mid-Atlantic Gas Services, LLC;
Gans
October 6, 2014  March 30, 2015 Evaluation
Final Permit
 Monongalia G70-A157
Rothwell
Northeast Natural Energy LLC;
Beach Wellpad
April 29, 2015   Final Permit
Evaluation
Interim Permit Review
 Application 
Monongalia  G70-A165
Kees
Northeast Natural Energy LLC;
coastal Wellpad
May 27, 2015   Applicaiton 
Evaluation
Final Permit
 Monongalia 13-3259
Rothwell
West Virginia University;
Downtown Campus
July 20, 2015   Application
Monroe
 Monroe G65-C550
Martin
Town of Alderson;
Lift Station #1
March 9, 2015   Application 
Evaluation
Final Permit
 Monroe G60-C073
Martin
Town of Alderson;
Wastewater Treatment
March 9, 2015   Application 
Evaluation
Final Permit
Morgan
 Morgan 13-2449I
Martin
Caperton Furnitureworks, LLC;
Berkeley Springs
May 5, 2015   Application 
Evaluation
Final Permit
 Morgan PD15-045
Martin
U.S. SILICA COMPANY;
Berekeley Springs Quarry
May 15, 2015   Application 
Evaluation
Determination
 Morgan PD15-049
Martin
U.S. SILICA COMPANY;
Berkeley Springs Quarry
June 17, 2015   Application 
Evaluation
Determination
 Morgan 13-2145D
Martin
U.S. SILICA COMPANY;
Berkeley Springs Quarry
June 29, 2015  August 28, 2015 Application 
Draft Permit
Fact Sheet
Ohio
Ohio  13-2822A
Martin
American Disposal Services of WV, Inc.
DBA Short Creek Landfill
September 20, 2014   Evaluation
Final Permit
Ohio  13-2922F
Kessler
 SWN Production Company, LLC;
Charles Fry Pad
April 27, 2015  August 27, 2015 Application 
Draft Permit
Fact Sheet
Interim Permit Review
Ohio  13-2790B
Martin 
Tunnel Ridge, LLC;
Triadelphia
March 11, 2015 June 5, 2015  Application 
Evaluation
Final Permit
Pendleton
 Pendleton 13-2715E
Kessler 
Columbia Gas Transmission, LLC;
Seneca Station
October 3, 2014   Evaluation
Final Permit
Pleasants
 Pleasants 13-3082A
Pursley
Allegheny Energy Supply Company, LLC;
Pleasnats Power Station - Will
June 22, 2015   Application
 Pleasants PD15-046
Pleasants
Axens North America, Inc.;
Belmont
May 20, 2015   Application 
Evaluation
Determination
Pleasants  13-2156V
Legg
Cytec Industries, Inc.;
Willow Island
 February 18, 2015   Application 
Evaluation
Final Permit
 Pleasants 13-2120I
Legg
Cytec Industries, Inc.;
Willow Island
March 3, 2015    Application 
Evaluation
Final Permit
 Pleasants PD15-040
Legg
Cytec Industries, Inc.;
Willow Island
May 8, 2015   Application
 Evaluation
Determination
 Pleasants G60-C067
Pursley
Pleasants Energy;
Waverly
October 6, 2014   Evaluation
Final Permit
 Pleasants 13-2373B
Pursley
Pleasants Energy;
Waverly
June 25, 2015   Application
Preston
Preston   13-2203A
Legg
Allegheny Wood Prodcuts Intrntl, Inc.;
Hazelton
April 21, 2015   Application 
Evaluation
Final Permit
 Preston 13-2658A
Andrews
WV Army National Guard;
Camp Dawson
June 2, 2015   Application 
Evaluation
Final Permit
 Preston  G60-C042B
Andrews
WV Army National Guard;
Camp Dawson
June 2, 2015   Application 
Evaluatioin
Final Permit
Putnam 
 Putnam 13-2663E
Pursley
Appalachian Power Company;
John Amos Plant
April 18, 2015  August 31, 2015 Application 
Interim Permit Review
Draft Permit
Fact Sheet
 Putnam PD15-022
Rothwell
Cranberry Pipeline Corporation;
Cabot 50 Wellpad
March 2, 2015   Application 
Evaluation
Determination
Putnam  13-3200
Pursley
FLSmidth USA Inc.;
Charleston Operations
July 11, 2013   Evaluation
Final Permit
Putnam  PD15-015
Kessler
Lexycon LLC;
Nitro
February 20, 2015   Application 
Evaluation
Final Permit
 Putnam 13-3213
Pursley
Multicoat Products Inc.;
Fraziers Bottom
September 25, 2014  January 28, 2015   Evaluation
Final Permit
Putnam  13-3213A
Legg
Multicoat Products Inc.;
Fraziers Bottom
July 7, 2015    Application
Putnam  PD15-044
Griffith
Solutia Inc.;
Nitro
May 13, 2015   Application 
Evaluation
Determination
 Putnam G60-C005B
Kessler
Toyota Motor Manufacturing, WV;
Buffalo
December 16, 2014    Application
Evaluation
Final Permit
 Putnam G60-C005C
Martin
Toyota Motor Manufacturing, WV;
Buffalo
June 11, 2015    Application 
Evaluation
Final Permit
Raleigh
 Raleigh 13-3030A
Jennings
CNX Gas Company;
Rowland Land #303
July 22, 2014   Evaluation
Final Permit
 Raleigh PD15-072
Rothwell
Enervest Operating, LLC;
Kanawha Shoals
August 7, 2015   Application
Evaluation
Determination
 Raleigh 13-2170A
Andrews
Federal Correctional Institute;
Beaver
December 9, 2014 April 15, 2015   Application 
Evaluation
Final Permit
 Raleigh PD15-028
Rothwell
Hardy Cellular Telephone Company:
Eccles- 757315
March 26, 2015   Application 
Evaluation
Determination
Raleigh  G10-D160
Roberts
Ochard Coal Company DBA Pocahontas Coal Sales;
Crab Orchard Loadout
 July 14, 2015   Final Permit
Evaluation 
Interim Permit Review
 Application
Randolph
 Randolph 13-1147Q
Pursley
Armstrong Hardwood Flooring Company;
Beverly
March 12, 2015   Application 
Evaluation
Final Permit
 Randolph 13-3211
Andrews
City of Elkins; Elkins Waste Water Treatment Plant September 18, 2014   Evaluation
Final Permit
 Randolph 13-3164A
Keatley
Columbia Gas transmission, LLC;
Files Creek
July 1, 2014    Evaluation
Final Permit
Randolph  G35-A027B
Keatley
Dominion Transmission, Inc.;
Cassity Mountain
April 10, 2015    Application
 Randolph 13-2315F
Kessler
Greenfield Cabinetry, LLC;
Elkins
May 18, 2015   Application
 Randolph PD15-029
Rothwell
Hardy Cellualr Telephone Company;
Leadsville- 416458
March 26, 2015   Application 
Evaluation
Determination
 Randolph G20-B037
Martin
Southern WV Asphalt, Inc.;
Kelly Mountain Quarry
October 21, 2014   Evaluation
Final Permit
Ritchie
Ritchie  13-3215
Jennings
Antero Midstream LLC;
West Mountain Station
October 1, 2014  May 22, 2015 Evaluation
Final Permit
 Ritchie G70-A136
Keatley
Antero Resources Corporation;
Buck Run Wellpad 
December 31, 2014   Application 
Evaluation
Final Permit
 Ritchie G70-A136A
Keatley
Antero Resources Corporation;
Buck Run Wellpad
April 30, 2015   Application 
Evaluation
Final Permit
 Ritchie G70-A171
Keatley
Antero Resources Corporation;
Charlene Pad
July 30, 2015   Application
 Ritchie G70-A150
Kees
Antero Resources Corporation;
Cottrill Wellpad
March 2, 2015   Application 
Evaluation
Final Permit
Ritchie  G70-A150A
Griffith
Antero Resources Corporation;
Cottrill Wellpad
 June 11, 2015   Application 
Evaluation
Final Permit
Ritchie  13-3240
Williams
Antero Resources Corporation;
Harshbarger FWI
March 3, 2015  June 12, 2015 Application 
Evaluation
Final Permit
 Ritchie G70-A134
Keatley
Antero Resources Corporation;
Ireland North Wellpad
 December 31, 2014    Application 
Evaluation
Final Permit
Ritchie  G70-A134A
Griffith
Antero Resources Corporation;
Ireland North Wellpad
April 30, 2015    Application 
Evaluation
Final Permit
 Ritchie G70-A147
Williams
Antero Resources Corporation;
Jackson Wellpad
February 12, 2015   Application 
Evaluation
Final Permit
 Ritchie G70-A118
Keatley
Antero Resources Corporation;
Kelly Wellpad
December 1, 2014   Evaluation
Final Permit 
Ritchie  G70-A118A
Keatley
Antero Resources Corporation;
Kelly Wellpad
March 11, 2015   Application 
Evaluation
Final Permit
 Ritchie G70-A118B
Keatley
Antero Resources Corporation;
Kelly Wellpad
April 30, 2015   Application 
Evaluation
Final Permit
 Ritchie G70-A115
Kees
Antero Resources Corporation;
Mackay Wellpad
November 24, 2014    
 Ritchie G70-A115A
Kees
Antero Resources Corporation;
Mackay Wellpad
March 11, 2015    Application 
Evaluation
Final Permit
 Ritchie G70-A111
Keatley
Antero Resources Corporation;
Mulvay Wellpad
November 17, 2014    Evaluation
Final Permit
Ritchie  G70-A111A
Griffith
Antero Resources Corporation;
Mulvay Wellpad 
April 30, 2015   Application 
Evaluation
Final Permit
 Ritchie G70-A097A
Kees
Antero Resources Corporation;
Ness Wellpad
March 26, 2015   Application 
Evaluation
Final Permit
 Ritchie G70-A117
Keatley
Antero Resources Corporation;
Noland Wellpad
December 1, 2014   Evaluation
Final Permit 
 Ritchie G70-A117A
Griffith
Antero Resources Corporation;
Noland Wellpad
April 30, 2015   Application 
Evaluation
Final Permit
Ritchie  G70-A140
Kees
Antero Resources Corporation;
Osborne Wellpad
January 21, 2015   Application 
Evaluation
Final Permit 
Ritchie  G70-A140A
Griffith
Antero Resources Corporation;
Osborne Wellpad 
April 30, 2015   Application 
Evaluation
Final Permit
Ritchie  G70-A075A
Kees
Antero Resources Corporation;
Walnut West Wellpad
July 10, 2015   Final Permit
Evaluation
Interim Permit Review 
Application
Ritchie  13-3119A
Williams
Antero Resources Corporation;
Yolanda Pad
June 23, 2014   Evaluation
Final Permit
 Ritchie G70-A129
Jennings
Antero Resources Corporation;
Zinn Wellpad
 December 15, 2014    Application 
Evaluation
Final Permit
 Ritchie G70-A129A
Griffith
Antero Resources Corporation;
Zinn Wellpad
April 30, 2015   Application 
Evaluation
Final Permit
 Ritchie 13-2497A
Kessler
Dominion Transmission, Inc.;
Craig Station
April 3, 2015 August 21, 2015  Application 
Draft Permit
Fact Sheet
Ritchie  G35-A117
Keatley
Dominion Transmission, Inc.;
Pullman, So. Oxford
November 7, 2014   Evaluation
Final Permit
 Ritchie G70-A146
Rothwell
EQT Production Company;
OXF-122 Pad
Februrary 3, 2015   Application 
Evaluation
Final Permit
Ritchie  G70-A164
Keatley
EQT Production Company;
OXF-163
May 21, 2015   Application
Ritchie  G70-A026A
Keatley
Noble Energy, Inc.;
Pennsboro 1
August 20, 2014   Evaluation
Final Permit 
 Ritchie G70-A155
Kees
Noble Energy, Inc.;
Pennsboro 2
April 15, 2015   Application 
Evaluation
Final Permit
Taylor
 Taylor 13-3116A
Pursley
E2 Engery Services;
Curry
August 25, 2014   Evaluation
Final Permit
Taylor  PD15-027
Rothwell
Hardy Cellular Telephone Company;
Pruntytown- 416460
March 26, 2015   Application 
Evaluation
Determination
 Taylor G70-A089
Jennings
PDC Mountaineer LLC;
Coulson 3 Pad
August 27, 2014    Withdrawal
 Taylor G35-A067E
Keatley
PDC Mountaineer;
East Coast Station
March 11, 2015   Application
 Taylor PD15-001
Pursley
Process Transloading Bridgeport LLC;
Bridgeport
December 31, 2014    Evaluation
Determination
Tyler
 Tyler 13-2259C
Pursley
Aleris Recycling, Inc.;
Bens Run
November 10, 2014    Evaluation
Final Permit
Tyler  G70-A085A
Kees​
Antero Resources Corporation;
Coastal 1 Pad
June 4, 2015   Final Permit
Evaluation
Interim Permit Review
Application
Tyler  G70-A126
Keatley
Antero Resources Corporation;
Dale Wellpad
December 11, 2014   Application 
Evaluation
Final Permit
 Tyler G70-A126A
Griffith
Antero Resources Corporation;
Dale Wellpad
April 30, 2015   Application 
Evaluation
Final Permit
Tyler  G70-A163
Kees
Antero Resources Corporation;
Edna Monroe Wellpad
May 20, 2015   Application
Evaluation
Final Permit
Tyler  G70-A143
Kees
Antero Resources Corporation;
Estlack Wellpad
January 21, 2015   Application 
Evaluation
Final Permit 
 Tyler G70-A143A
Kees
Antero Resources Corporation;
Estlack Wellpad
July 30, 2015   Application
Tyler
 
G70-A144
Kees
Antero Resources Corporation;
Folger Wellpad
January 21, 2015   Application 
Evaluation
Final Permit
 Tyler G70-A144A
Griffith
Antero Resources Corporation;
Folger Wellpad
June 11, 2015    Application 
Evaluation
Final Permit
 Tyler G70-A007A
Jennings
Antero Resources Corporation;
Graff Wellpad
Decmber 15, 2014    Application 
Evaluation
Final Permit
 Tyler G70-A067A
Kees
Antero Resources Corporation;
Hartley East Wellpad
June 2, 2015   Final Permit
Evaluation
Interim Permit Review
 Application 
 Tyler G70-A135
Keatley
Antero Resources Corporation;
Heaster Wellpad
December 31, 2014    Application 
Evaluation
Final Permit
 Tyler G70-A135A
Keatley
Antero Resources Corporation;
Heaster Wellpad
April 30, 2015   Application 
Evaluation
Final Permit
 Tyler 13-3184A
Kessler
Antero Resources corporation;
Monroe Station
January 7, 2015  April 17, 2015 Application 
Evaluation
Final Permit
 Tyler 13-3166A
Williams
Antero Resources Appalachian Corporation;
Mountain Station
January 7, 2015  May 1, 2015  Application 
Evaluation
Final Permit
Tyler  G70-A029A
Kees
Antero Resources Corporation;
Pierpoint Wellpad
October 27, 2014   Evaluation
Final Permit
 Tyler G70-A029B
Kees
Antero Resources Corporation;
Pierpoint Wellpad
May 21, 2015   Application 
Evaluation
Final Permit
Tyler  G70-A102
Kees
Antero Resources Corporation;
Sancho Wellpad
October 29, 2014   Evaluation
Final Permit
 Tyler G70-A073
Jennings
Antero Resources Corporation;
Weigle East Wellpad
August 1, 2014   Issued November 24, 2014
 Tyler G70-A073A
Kees
Antero Resources Corporation;
Weigle East Wellpad
 June 2, 2015   Final Permit
Evaluation
Interim Permit Review
 Application
 Tyler G70-A101
Kees
Chesapeake Appalachia, LLC;
Kirk Hadley Pad
October 21, 2014   Issued November 26, 2014
Tyler  13-3207
Williams
CONE Gathering, LLC;
Shirley Station
September 5, 2014   Issued December 29, 2014 
Tyler  13-3221
Andrews
Dominion Transmission, Inc.;
Ben's Run Terminal
October 29, 2014    Evaluation
Final Permit 
 Tyler 13-1104F
Kessler
Dominion Transmission, inc.;
Deep Valley Station
April 3, 2015 August 28, 2015  Application 
Draft Permit
Fact Sheet
Interim Permit Review
Tyler  G70-A087
Keatley
Eureka Hunter Pipeline, LLC;
Weese Station
August 20, 2014   Issued December 16, 2014
 Tyler 13-3225
Keatley
Jay-Bee Oil & Gas;
Big Moses Site
November 12, 2014 April 3, 2015  Evaluation
Final Permit
 Tyler G35-A065A
Kees
Jay-Bee Oil & Gas;
Bunker Run Site
July 6, 2015 Application
 Tyler G70-A148
Kees
Jay-Bee Oil & Gas, Inc.;
Doc Wellpad
February 11, 2015    Application 
Evaluation
Final Permit
 Tyler G70-A128
Kees
Jay-Bee Oil & Gas, Inc.;
Gorby Wellpad
December 11, 2014    Application
Evaluation
Final Permit 
 Tyler G70-A138
Kees
Jay-Bee Oil & Gas Inc.;
Grumpy Wellpad
January 13, 2015   Application 
Evaluation
Final Permit 
 Tyler 13-3257
Keatley
Jay-Bee Oil & Gas Inc.;
Ketel Site
June 30, 2015   Application
 Tyler G70-A149
Kees
Jay-Bee Oil & Gas Inc.;
Maddie Mae Wellpad
February 23, 2015   Applicaiton 
Evaluation
Final Permit
 Tyler G70-A054
Kees
Jay-Bee Oil & Gas;
RPT5
 June 4, 2014   Issued November 12, 2014
Tyler  G70-A053
Kees
Jay-Bee Oil & Gas;
RPT8
June 3, 2014   Issued November 12, 2014
 Tyler G70-A049
Kees
Jay-Bee Oil & Gas, Inc.;
T1-03
May 14, 2014   Issued Nomvember 12, 2014
 Tyler G70-A076
Keatley
Jay-Bee Oil & Gas;
T1213
August 11, 2014   Issued November 26, 2014
Tyler  G70-A080
Kees
Jay-Bee Oil & Gas;
W701
August 11, 2014   Issued November 26, 2014
 Tyler G60-C030A
Martin
MPM Silicones, LLC;
Friendly
November 6, 2014   Issued December 10, 2014
Tyler  G70-A038
Keatley
Noble Energy, Inc.;
SHR1 Production Facility
April 10, 2014   Issued November 12, 2014
 Tyler G70-A056
Keatley
Statoil USA Onshore Properties, Inc.;
Ball Station
June 11, 2014    
 Tyler G70-A101A
Griffith
SWN Production Company, LLC;
Kirk Hadley Pad
July 2, 2015   Final Permit
Evaluation
Interim Permit Review
 Application
 Tyler 13-3214
Jennings
Triad Hunter, LLC;
Stewart Winland Production Facility
October 1, 2014   Issued December 5, 2014
Upshur
 Upshur 13-2804A
Legg
Champion Technologies, Inc.;
Buckhannon
February 10, 2015   Application 
Evaluation
Final Permit
 Upshur 13-2394A
Andrews
Columbia Gas Transmission, LLC;
Cleveland
October 20, 2014   Evaluation
Final Permit 
 Upshur 13-3041A
Pursley
EQT Production LLC;
Alton Station
October 17, 2014    Evaluation
Final Permit
 Upshur 13-3041B
Kees
EQT Prduction, LLC;
Alton Station
March 9, 2015   Application 
Evaluation
Final Permit
Upshur  PD15-026
Rothwell
S.P.M. Flow Control, Inc.;
Buckhannon
March 9, 2015   Application 
Evaluation
Determination
Wayne
 Wayne G20-B024C
Martin
American Asphalt of WV, LLC;
Kenova
October 15, 2014   Issued December 1, 2014
Wayne  13-3182T
Jennings
Ashland Inc.;
Neal
April 3, 2014    Evaluation
Final Permit
 Wayne 13-2251E
Williams
Columbia Gas Transmission, LLC;
Kenova
June 30, 2015   Application
Wayne  G35-A113A
Griffith
Cranberry Pipeline Corp.;
Rich Creek Station
April 24, 2015   Application 
Evaluation
Final Permit
 Wayne 13-2290K
Andrews
Dept. of Veterans Affairs;
VA Medical Center Huntington
September 17, 2014 January 12, 2014 Draft Permit
Fact Sheet 
 Wayne 13-2290L
Legg
Dept. of Veterans Affairs;
VA Medical Center Huntington
April 20, 2015 July 26, 2015  Evaluation
Final Permit
Wayne  13-3247
Roberts
 Everett Energy LLC;
Powdermill
April 30, 2015 July 24, 2015   Final Permit 
Evaluation
Draft Permit
Fact Sheet
Interim Permit Review
Application
Wayne  13-1814E
Keatley
MarkWest Energy Appalachia, LLC;
Kenova
January 26, 2015   Application 
Evaluation
Final Permit
 Wayne 13-1814F MarkWest Energy Appalachia, LLC;
Kenova
April 27, 2015   Application 
Evaluation
Final Permit
Wayne  13-2290L
Legg
Veterans Affairs Medical Center;
Huntington
April 20, 2015   Application
Wetzel 
Wetzel  G70-A009A
Kees
American Energy-Marcellus, LLC;
Long 408/409
December 9, 2014   Application 
Evaluation
Final Permit
 Wetzel G70-A156
Kees
American Energy-Marcellus, LLC;
Mary Miller 
April 21, 2015   Application 
Evaluation
Final Permit
 Wetzel G70-A124
Pursley
American Energy-Marcellus, LLC;
WJ Criswell 405
December 10, 2014   Evaluation
Final Permit 
 Wetzel G70-A124A
Keatley
American Energy-Marcellus, LLC;
WJ Criswell 405
April 14, 2015   Application 
Evaluation
Final Permit
Wetzel   G70-A124B
Keatley
American Energy-Marcellus, LLC;
WJ Criswell 405
July 30, 2015   Applicaiton
Wetzel  13-2064G
Williams
Columbia Gas Transmission, LLC;
Smithfield
June 11, 2015 August 21, 2015  Application 
Draft Permit
Fact Sheet 
Interim Permit Review
 Wetzel 13-3249 Dominion Transmission, Inc.;
Hastings Comp. Sta 
March 26, 2015   Application
 Wetzel PD15-031
Andrews
Dominion Transmission, Inc.;
Hastings Extraction
April 3, 2015   Application 
Evaluation
Determination
 Wetzel 13-3224
Andrews
Equitrans, LP;
Corona Station
November 12, 2014 June 22, 2015  Evaluation
Final Permit
 Wetzel G70-A145
Kees
EQT Production Company;
BIG 57 Pad
Jamuary 30, 2015   Application 
Wetzel  G70-A107
Kees
EQT Production Co.;
BIG-367
October 31, 2014    Evaluation
Final Permit
Wetzel  G70-A106
Kees
EQT Production Co.;
PNG-103
October 31, 2014   Evaluation
Final Permit 
Wetzel  PD15-038
Griffith
MarkWest Liberty Midstream & Resources LLC;
Mobley
April 24, 2015   Application 
Evaluation
Determination
 Wetzel 13-2878D
Andrews
MarkWest Liberty Midstream & Resources LLC;
Mobley Gas Plant
May 5, 2015   Application
 Wetzel 13-3171A
Legg
Stone Energuy Corporation;
Howell Wellpad
October 14, 2014 January 30, 2015    Evaluation
Final Permit 
 Wetzel 13-3196
Williams
Stone energy Corporation;
Lemons
June 9, 2014   Issued November 17, 2014
Wetzel  13-3245
Keatley
Stone Energy Corporation;
Martin Wellpad
April 20, 2015   Application 
Withdrawal
 Wetzel 13-3191
Keatley
Stone Energy Corporation;
Maury Wellpad
May 20, 2014 April 3, 2015  Evaluation
Final Permit 
Wetzel  13-3154B
Keatley
Stone Energy Corporation;
Mills Wetzel Pad 3
June 12, 2014    
 Wetzel 13-3190
Keatley
Stone Energy Corporation;
Potts Wellpad
May 20, 2014  January 23, 2015 Evaluation
Final Permit 
 Wetzel 13-3193
Jennings
Stone Energy Corporation;
Weekley
May 22, 2014 April 3, 2015  Evaluation
Final Permit
 Wetzel 13-3195
Williams
Stone Energy corporation;
Wilson
June 9, 2014   Issued November 17, 2014
 Wetzel 13-3060A
Griffith
Stone Energ Corporation;
Winters Station
May 14, 2015   Application 
Evaluation
Final Permit
 Wetzel 13-3192
Jennings
Stone Energy corporation;
ZMBG Wellpad
May 16, 2014   Evaluation
Final Permit 
Wetzel  G70-A166
Rothwell
SWN Production Company, LLC;
Ridgetop Land Wellpad
June 4, 2015
Resubmittal - June 29, 2015
  Application 
Application Resubmittal
 Wetzel G70-A152
Williams
Triad Hunter, LLC;
WVDNR Pad No. 6
March 10, 2015   Application 
Evaluation
Final Permit
 Wetzel 13-3234
Kees
Williams Ohio Valley Midstream LLC;
Anderson Dehy Station 
February 3, 2015  May 1, 2015  Application 
Evaluation
Final Permit
 Wetzel 13-3063B
Keatley
Williams Ohio Valley midstream, LLC;
Yoho Station
May 29, 2015   Application
Wood
Wood  13-0280C
Martin
Camden Materials;
Parkersburg
November 17, 2014   Evaluation
Final Permit
Wood  13-1353G
Egnor
The Chemours Company FC, LLC;
Washington Works
May 12, 2015   Application 
Evaluation
Final Permit
 Wood 13-2365G
Egnor
The Chemours Company FC, LLC;
Washington Works
May 12, 2015   Application
Evaluation
Final Permit
 Wood 13-1823K
Egnor
The Chemours Company FC, LLC;
Washington Works
May 21, 2015    Final Permit
Evaluation
Interim Permit Review
Application
Wood  13-1953I
Egnor
The Chemours Company FC, LLC;
Washington Works
May 21, 2015   Application 
Evaluation
Final Permit
 Wood 13-2391I
Egnor
The Chemours Company FC, LLC;
Washington Works
May 21, 2015   Application 
Evaluation
Final Permit
 Wood 13-0815I
Egnor
The Chemours Company FC, LLC;
Washington Works
May 21, 2015   Evaluation
Final Permit
Wood  PD15-061
Egnor
The Chemours Company FC, LLC;
Washington Works
July 31, 2015   Evaluation
Determination
Wood  13-2330G
Egnor
E. I. du Pont de Nemours and Company;
Washington Works
January 14, 2015    Application
Evaluation
Final Permit
Wood  13-2381H
Egnor
E. I. du Pont de Nemours and Company;
Washington Works
January 5, 2015   Application 
Wood  13-1823J
Egnor
E. I. du Pont de Nemours and Company;
Washington Works
January 26, 2015   Application 
Evaluation
Final Permit 
 Wood PD15-032
Rothwell
E. I. du Pont de Nemours and Company;
Washington Works
April 3, 2015   Application 
Evaluation
Determination
 Wood  13-3251
Rothwell
Hino Motors Manufacturing USA, Inc.;
Williamstown
May 26, 2015 September 5, 2015  Application 
Interim Permit Reivew
Draft Permit
Fact Sheet
Wood  G40-C015G
Martin
Martin Marietta Materials, Inc.;
Burning Springs Mine
November 21, 2014    
 Wood PD15-048
Kessler
North American Demolition Company;
SABIC Innovative Plastics
June 9, 2015    Evaluation
Determination
 Wood 13-2285C
Legg
Northwest Pipe Company;
Washington
April 13, 2015   Application 
Evaluation
Final Permit
 Wood 13-2527E
Pursley 
Pactive Packaging Inc.;
Mineral Wells
August 25, 2014   Issued December 16, 2014
 Wood 13-3241
Pursley
Parkersburg Utility Board;
Wastwater Treatment
March 11, 2015   Application 
Interim Permit Review
Evaluation
Final Permit
 Wood PD15-033
Kessler
SABIC innovative Plastics US LLC;
Washington
April 9, 2015   Application 
Determination
Wyoming
Wyoming  13-2066D
Legg
Columbia Gas Transmission, LLC;
Huff Creek
April 21, 2015   Application 
Evaluation
Final Permit
Wyoming PD15-073
Rothwell
Enervest Operating, LLC;
Dry Branch Station
August 7, 2015   Application 
Evaluation
Determination
Wyoming  PD15-064
Rothwell
Enervest Operating;
Huff Creek
August 7, 2015    Application
Evaluation
Determination
 Wyoming 13-2183L
Roberts
Pinnacle Mining Co., LLC;
Pineville
February 14, 2014  April 17, 2015 Draft Permit
Fact Sheet 
Withdrawn
 Wyoming PD15-042
Roberts​
Pinnacle mining Company, LLC;
Pineville
May 12, 2015   Application 
Determination
 
  13-3258
Martin
Boxley Concrete Products of VA, Inc.;
Lewisburg
July 10, 2015  September 11, 2015 Application 
Draft Permit
Fact Sheet
  G40-C067A
Roberts
DIRTCON;
Philippi Quarry
November 22, 2013    Withdrawal
  G50-B105
Martin 
R.G. Johnson Company, Inc.;
5 North #4 Airshaft
May 12, 2015   Application 
Evaluation
Final Permit
   G50-B073-P3
Martin
R.G. Johnson Company, Inc.;
7 North Portal
March 24, 2015   Application
 Evaluation
Final Permit
  G50-B104
Marting 
Tri-State Paving & Sealcoating, LLC dba MoZack Concrete;
Winfield
March 25, 2015   Application
 Evaluation
Final Permit

Privacy, Security and Accessibility | WV.gov | USA.gov | © 2015 State of West Virginia